Kunshan Plant · Jiangsu  |  Hefei Plant · Anhui, China [email protected]  |  WhatsApp +86 132 6227 6239
C-BOX Electronic Technology Request a Quote

C-BOX News

News & updates

Project deliveries, factory updates and new capabilities from C-BOX — chassis and precision sheet-metal work from Kunshan, cabinets from Hefei, international sales from Shanghai.

Spacecraft model — C-BOX cabinet systems delivered for China's space programmes
2026 · 09Project Delivery

Cabinet systems delivered for China's space programmes

C-BOX supplied complete electronic cabinet systems to the 16th Research Institute of CETC (Hefei) for its space-electronics programmes, including the "Aerospace BeiDou" satellite navigation system and the Chang'e-5 lunar mission ground systems. Precision, traceability and documentation were held to aerospace-level requirements throughout.

2026 · 09Inside the Factory

Factory tour: laser cutting to finished chassis

Walk our production floor: fiber laser cutting, CNC turret punching, press-brake bending, welding, powder coating and subrack assembly — all in-house at our Kunshan and Hefei plants. More footage from both plants is on the Company page.

High-Tech Enterprise certificate of C-BOX Hefei Plant
2024 · 10Certification

C-BOX Hefei Plant accredited as a High-Tech Enterprise

C-BOX Electronic Technology Co., Ltd. (Hefei Plant) received the provincial High-Tech Enterprise accreditation (Certificate No. GR202343003343), in addition to the ISO 9001 certification held at both plants. All certificate scans are published on the Company page.

CPCI EMC test report cover
2026 · 09Quality

Full third-party type-test reports now published

We have published complete scans of third-party type-test reports covering EMC, electromagnetic shielding, salt spray, connection resistance and vibration (IEC 61373) — verifiable with the issuing laboratories. See the Type-Test Reports section.

C-BOX Hefei new cabinet plant building
2026 · 09Capacity

New cabinet plant building now in operation at Hefei

The newest production building at our Hefei (Changfeng) campus is completed and running — expanding cabinet and enclosure capacity on the 23,000 m² site. Exterior views at day, dusk and night are in the facilities gallery. Current group capacity: 8,000 functional chassis, 200,000 standard chassis and 5,000 EMC profile cabinets per year.

2026 · 09Inside the Factory

Subrack assembly line — real-time clip

Front panels, guides and fasteners going onto 19″ subracks at our assembly benches — torque-controlled tooling, foam-lined trays and per-unit checks. More clips from both plants on the Company page.

2026 · 09Capacity

New large-scale equipment moved into our Anhui plant

Delivery of a new large-format machine into our Anhui (Hefei) plant — unloaded and positioned on the shop floor, part of our ongoing investment in production capacity and processing capability for large cabinet systems. Clips of the line running are on the Company page.

Mid-Autumn Festival gifts at C-BOX reception
2026 · 09Company Life

Mid-Autumn Festival at C-BOX

Festival gift bags for every colleague at the Kunshan plant — a small thank-you from the team before the Mid-Autumn holiday. From all of us at C-BOX: happy Mid-Autumn Festival!

C-BOX 19-inch subrack system
2026 · 09Website

Welcome to the new C-BOX website

Our new English site is online — with the full product range, 52 granted patents with certificate scans, type-test reports, a photo gallery of both plants and a direct RFQ form that reaches our export team within minutes.

Have a project we can help with?

Send a drawing or a part number — we reply within 24 hours on business days.

Request a Quote